Pool Repainting · Sydney Metro

A pool that looks brand new. And a finish that proves it.

Three coats of APCO Poolkote Epoxy, full surface preparation, and a 12-month workmanship warranty. We handle everything — from drain to swim-ready.

Fixed Quotes
So you know the cost
Result Guaranteed
We know that you will be happy with the result
5.0★
3 coats
Standard on every job
Fixed quote
No surprises on the day
Guarantee
Your satisfaction is guaranteed
21 days
Drain to swim-ready
Is it time?

How do you know when it's time to repaint?

Pool paint doesn't fail overnight — it gives you signs. If you're seeing any of these, a repaint is likely the most cost-effective fix compared to ongoing patching or chemical overcorrection.

Not sure if you need a full repaint or just an acid wash? We'll tell you honestly at the inspection. No hard sell.

Get a free assessment

Chalky or powdery surface

Paint oxidised by UV and chemicals starts to chalk. You'll notice it on your hands after touching the walls.

Visible fading or discolouration

Patchy, washed-out colour means the top coat has broken down and is no longer protecting the shell.

Rough or peeling texture

Flaking or bubbling paint traps algae and makes the pool uncomfortable to use.

Stains that won't shift

Calcium scaling and mineral staining embed into a degraded paint surface and won't respond to normal treatment.

Ongoing algae problems

A porous or failing surface creates the perfect environment for algae to re-establish — even with correct chemistry.

It's been 8–10 years

Most pool paints have a natural service life in Sydney conditions. Repainting before failure is always cheaper than after.

What we do

Everything from drain to swim-ready — handled.

A Sydney Pool Servicing repaint covers the full job. No subcontracting the prep work, no skipping primer, no hidden extras discovered on day two. Your quote is itemised so you can see exactly what you're paying for.

Full pool drainage

We pump out and safely dispose of your pool water via the waste water line before any surface work begins.

Mechanical surface sanding

The entire pool shell is sanded and abraded to create a clean, profiled surface for the paint to bond to. This is the step that makes paint last — we don't skip it.

Pressure wash & acid etch

The surface is pressure washed then treated with hydrochloric acid to remove residual calcium deposits and ensure maximum adhesion.

Surface crack & chip repair

Any cracks, chips or hollow spots are filled with sand and cement render prior to painting. This is included in your quote.

Taping & paint preparation

Tiles, coping and fittings are masked before any paint is applied.

Three coats of APCO Poolkote Epoxy

We apply three full coats of APCO 2-Pack Epoxy pool paint — locally manufactured in Sydney, UV-stable, and chemically resistant. Pebblecrete surfaces receive a 4th and potentially 5th coat.

Controlled cure period

The freshly painted surface must remain dry and empty for 10–14 days after the final coat. We will not rush this step — premature refilling is one of the most common causes of early paint failure.

Refill oversight & chemistry rebalance

Once cured, you fill the pool via hose and we return to site to rebalance all water chemistry and confirm the pool is swim-ready. Budget ~$250 for restart chemicals, invoiced separately.

Completion documentation

You receive a completion report photographed at each stage and your 12-month workmanship warranty in writing.

Silica dust disclosure

Pool sanding generates silica dust, which requires full PPE for our team during the abrading process. We use dust-reduction methods throughout, but it is impossible to eliminate completely. We recommend keeping windows and doors adjacent to the pool closed on sanding days.

Choose your colour

Colour cards on-site at your inspection — before you commit.

We use APCO Poolkote 2-Pack Epoxy — UV-stable, chemically resistant, and manufactured here in Sydney. The colours below are available for concrete, pebblecrete and marblite pools.

Because APCO Poolkote is a custom-manufactured 2-pack product, your colour choice must be confirmed at the time of paying your deposit. We bring physical colour cards to every inspection so you can see how each colour looks in your backyard before deciding.

Full colour range available on the APCO website. Colour on screen differs from real-world result — always review physical samples before approving. Colour change from dark to very light may require an additional primer coat.

Get a colour sample
Aqua Blue
Bright Blue
★ Most popular
Sapphire
Royal Blue
Bright White
Off White / Ivory
Slate Grey
Charcoal

APCO Poolkote 2-Pack Epoxy — locally manufactured in Sydney

UV-stable, chemically resistant, and the leading pool coating in Australia.

How it works

From empty pool to swim-ready in around 21 days.

The single biggest variable is the condition of your pool's surface. We'll give you a more precise timeline in your written quote after the inspection.

1

Drain & initial clean-out

Day 1

We fully pump out your pool water to waste and remove all surface debris. This gives us clear access to inspect every centimetre of the shell — including areas never visible when the pool is full.

2

Surface sanding & abrading

Days 2–3

The entire concrete surface is mechanically sanded and abraded to create a clean, profiled substrate. This is the most labour-intensive step — and the most important. Our team wears full respirators, gloves, eye and skin protection. We suggest keeping windows and doors closed on these days.

3

Pressure wash & acid etch

Day 3–4

The abraded surface is pressure washed at high pressure, then treated with hydrochloric acid to neutralise calcium deposits and etch the surface for paint adhesion. After acid washing, the pool is thoroughly rinsed.

4

Surface crack & chip repair

Day 4

Any cracks, chips or hollow spots identified during preparation are filled with sand and cement render and allowed to cure before painting begins. Minor repairs are included in your quote.

5

Taping & paint preparation

Day 5

Tiles, coping, fittings and any surfaces not being painted are masked and protected before any paint is applied. This step is what keeps the finish looking clean and professional.

6

Three coats of APCO Poolkote Epoxy

Days 5–8

We apply three full coats of APCO 2-Pack Epoxy, allowing proper drying time between each coat. Pebblecrete surfaces receive a 4th and potentially 5th coat. We have budgeted 40 litres of paint — if more is required we'll notify you.

7

Cure period, refill & chemistry balance

Days 9–21

The freshly painted surface must remain dry, empty, and unused for 10–14 days while the epoxy cures fully. At the end of the cure period, you fill the pool via hose. We return to rebalance all water chemistry and confirm your pool is swim-ready. Budget approximately $250 for startup chemicals, invoiced separately.

Project timelines are weather dependent. Works may be paused at our discretion in the event of rain, high humidity, or low temperatures — pool paint will not cure correctly in unsuitable conditions. We'll keep you updated throughout.

Pricing

Itemised quotes. The price we quote is the price you pay.

Every SPS repaint quote is broken down by stage so you can see exactly what you're paying for. There are no vague lump sums. Below is a guide to the typical cost categories and what drives the price of each.

What's included Typical range
Pool drainage
Pump-out, waste disposal, initial clean
$400–$600
Surface repair
Crack filling, render patching
$500–$1,000+
Surface preparation
Mechanical sanding, pressure wash, acid etch, masking, PPE
$3,500–$6,000
Paint application
3 coats APCO Epoxy pool paint
$2,500–$6,000
Paint & materials
APCO Poolkote 2-Part Epoxy, primer, consumables
$1,200–$2,500
Refill & chemistry balance
Return visit, water balance, swim-ready sign-off
$250–$400
Total (indicative) $6,000–$12,000+

Pricing reflects the real cost of a properly prepared, three-coat epoxy repaint in Sydney. Quotes that come in significantly lower typically involve less surface preparation or fewer coats — both reduce the lifespan considerably. Startup chemicals (~$250) are budgeted separately.

Get a fixed quote within 1 business day.

Tell us your suburb, pool surface type, and what you're seeing. We'll come out, walk the pool with you, bring colour cards, and send a written itemised quote.

0433 496 708
Payment terms

A deposit of 60% is required before works commence — this is also when you confirm your colour choice. The remaining 40% is due upon application of the final coat. Quotes valid for 14 days.

Why us

Three ways to repaint a pool. Here's the honest difference.

Possible, but risky

DIY repaint

  • Rollers and pool paint from a pool shop are available — but without mechanical sanding, paint bonds to the old surface, not the shell
  • Most DIY repaints bubble and peel within 2 years because a garden hose and broom can't get a surface clean enough
  • No silica dust safety management — sanding without proper respiratory PPE is a genuine health risk
  • No warranty on workmanship
Watch out for shortcuts

Cheapest quote

  • ! Low quotes usually mean surface preparation was quoted as a few hours, not 2 days of mechanical sanding
  • ! Single coat instead of three — you'll see the difference within a season
  • ! Signs of a cut-price job: no itemised quote, no line item for PPE, starts within days of accepting
  • ! You'll be repainting again in 3–4 years instead of 8–10
What we do

Sydney Pool Servicing

  • Full mechanical sanding every job — no exceptions
  • Pressure wash + hydrochloric acid etch before any paint is applied
  • Three coats of APCO Poolkote; four to five on pebblecrete
  • Minor crack and chip repairs included in your itemised quote
  • 12-month workmanship warranty against peeling or adhesion failure caused by our preparation or application
  • Completion report photographed at each stage

What customers say

4.9★ across 140+ Google and Airtasker reviews.

"Quoted us for a repaint and stuck to it. The finish is honestly better than when the pool was new. They brought colour swatches to the house which I really appreciated — made choosing so much easier."

P
Priya N.
Cronulla

"We had a lot of quotes and these guys were mid-range — but the only ones who could explain exactly what surface preparation they were doing and why. Glad we went with them. Pool looks incredible."

J
James T.
Lane Cove

"Found a crack during the sanding that three other companies had missed in their quotes. Repaired it as part of the job and the price didn't change. That's the kind of service you remember."

M
Michael R.
Bankstown

Common questions

The things people usually ask before they book.

Can't see your question? Give us a call on 0433 496 708

We repaint concrete, pebblecrete and marblite pools. Fibreglass pools cannot be repainted with standard epoxy pool paint — they require a fibreglass resurfacing process, which is a different trade. If you're unsure what your pool shell is, we'll identify it at the inspection.
From draining to swim-ready, the total project is approximately 21 days for most pools. This includes preparation (2–4 days), painting (3–4 days with drying time between coats), and the mandatory cure period of 10–14 days before refilling. The single biggest variable is the condition of the surface — heavily pitted or damaged pools take longer to prepare.
With proper mechanical preparation and three coats of APCO Poolkote, you can expect 8–10 years of service life in normal Sydney conditions. Surface preparation is the single biggest factor in longevity. We provide a 12-month workmanship warranty against peeling or adhesion failure caused by our preparation or application methods.
At the time of paying your 60% deposit. APCO Poolkote is a 2-pack product that is custom-manufactured — it takes a few days to produce and arrive on site. We can't begin work until the paint is here. We'll bring physical colour cards to your inspection so you can see how each option looks in your own backyard before committing.
Yes — colour changes are common. Going from a light colour to a significantly darker one, or vice versa, may require an additional primer coat to ensure full, even coverage. We'll advise on this in your quote.
Pool sanding requires mechanical abrading of the entire concrete surface, which generates silica dust. Our team wears full respiratory protection, eye, skin and ear protection on sanding days. We use dust-reduction methods throughout but can't eliminate it completely. We recommend keeping windows and doors adjacent to the pool closed during the sanding process — usually 1–2 days.
Sometimes. If the existing paint is bonding well and not flaking or bubbling, we can paint over it. If it's delaminating, the old paint must be fully removed first — otherwise the new coat will fail with it. We assess this during the inspection and quote accordingly.
Minor cracks and chips are included in your quote. If structural repairs are needed beyond the scope we quoted — crack injections, resurfacing, or significant render work — we'll pause and provide a variation quote before proceeding. No additional work is done without your approval.
No — chemicals for restarting the pool after refilling are invoiced separately. We suggest budgeting approximately $250 for this. We return to site after refilling to test, balance, and confirm the pool is swim-ready.
Ready to go?

Get a fixed, itemised quote within one business day.

Tell us your suburb, pool surface type, and what you're seeing — we'll visit, walk the pool with you, show you colour cards, and send a written quote with every line item broken down.

Request a quote Call 0433 496 708

Fixed-price quote · 3-coat APCO Poolkote · 12-month workmanship warranty · Family-run · Fully insured